5 years ago
Monday, April 11, 2011
Back
Back to work. Drywall is done and so is paint. Time for lights, outlets, and switched to go back on. All thats left is put down a couple hundred sq feet of tile, hang 4 doors, nail a bunch of base and casing all over, install some laminate floor, line the sauna with cedar, mount some cabinets, build a bar, and have carpet installed. Uggg... At least in the mean time with nice weather I got a chance to dig a 30' ditch by hand to drain my backyard pond.
Subscribe to:
Post Comments (Atom)
1 comment:
Drain the pond? Sheit - line the focker with tarps, and swim in it with cans of High Life floating around like bobbing apples.
Post a Comment