Back to work. Drywall is done and so is paint. Time for lights, outlets, and switched to go back on. All
thats left is put down a couple hundred sq feet of tile, hang 4 doors, nail a bunch of base and casing all over, install some laminate floor, line the sauna with cedar, mount some cabinets, build a bar, and have carpet installed.
Uggg... At least in the mean time with nice weather I got a chance to dig a 30' ditch by hand to drain my backyard pond.